Over 10 years of experience

office@rorexpipe.com

+40 723 277 877

 

In 2021, as part of the National Programme for the Rehabilitation of Primary Irrigation Infrastructure, ROREX PIPE participated in the “Rehabilitation of the Sinoe Irrigation Scheme (Constanța County)” project, contributing to the modernisation of the agricultural water conveyance infrastructure in the Dobrogea region.

The project included the rehabilitation of the Sinoe Main Pumping Station (SPB Sinoe), with a flow rate of 41,040 m³/h, as well as the modernisation of the CA Sinoe and CA4 Sinoe main canals. These works were essential for improving the operation of the irrigation system and increasing the efficiency of water distribution to the agricultural areas it serves.

As part of this irrigation infrastructure project, ROREX PIPE supplied DN 2800 GRP/PAFSIN pipes, which were integrated into the main water conveyance system.

Technical specifications of the supplied pipes

  • PAFSIN pipes with couplings
  • Nominal diameter: DN 2800
  • Nominal pressure: PN 10
  • Stiffness class: SN 5000
  • Pipe length: 12 m

Quantity supplied

  • 1,608 m of GRP/PAFSIN pipes
  • 12 fittings (elbows and tees)

Project information

  • Beneficiary: ANIF Bucharest – Constanța Branch
  • Contractors: ACVATOT SRL – IRIDEX GROUP PLASTIC SRL Consortium (currently INOVECO SRL)
  • Total contract value: RON 27,117,772.06

The rehabilitation of the primary irrigation infrastructure within the Sinoe irrigation scheme helped reduce water losses across the conveyance network, increase the efficiency of the irrigation systems, and support the stability of agricultural production in Dobrogea, a region frequently affected by periods of drought.